Interior remodel on Dodowah Road, Carnelian Bay

This Carnelian Bay remodel started with interior demolition and reworked most of the house. The old bathroom, laundry and entry became a mudroom, a new full bath went in where the kitchen used to be, and the kitchen shifted toward the living room with a new window over the sink and a coffee bar.

What we did

  • Interior demolition
  • Mudroom with stackable washer and dryer in place of the old bath and laundry
  • New full bathroom with walk-in tile shower
  • Kitchen relocated, with new cabinets, countertops and a coffee bar
  • Upstairs bathroom with double vanity, walk-in tile shower and new linen closet
  • Tongue and groove on the staircase wall to match the living room
  • New flooring and paint throughout
  • Can lights in the bedrooms, kitchen and baths
  • Electrical by Johannsson Electric, tile by Whaley Tile

Project details

  • Location: Carnelian Bay, CA
  • Type of work: Interior remodel
  • Year: 2025

Planning a remodel in Carnelian Bay? Send us a job request and we'll come take a look. Browse more of our work on the projects map.

Eagle Bear Construction, California Lic. #1057007, has worked on homes and buildings around Truckee and North Lake Tahoe since 1996.

Previous
Previous

Bathroom leak repair on Big Pine Drive, Tahoe City

Next
Next

Loft addition and remodel on Christy Lane, Olympic Valley