This interior remodel on Cedar Crest Avenue in Sunnyside was a facelift of the finishes. Carpet came out for new laminate flooring, the kitchen got a new slab countertop and undermount sink, and both bathtubs were replaced with tile showers.
What we did
- Carpet replaced with laminate flooring
- New slab kitchen countertop and undermount sink
- New kitchen cabinets, microwave and range hood
- Both bathtubs replaced with tile showers
- New vanities, plumbing fixtures and light fixtures
- New metal stair and loft railing with a wood top cap
- Wood paneling painted and drywall refinished smooth
- Door and window trim refinished
Project details
- Location: Sunnyside, Tahoe City, CA
- Type of work: Interior remodel
- Year: 2024
Planning a remodel in Sunnyside? Send us a job request and we'll come take a look. Browse more of our work on the projects map.
Eagle Bear Construction, California Lic. #1057007, has worked on homes and buildings around Truckee and North Lake Tahoe since 1996.

